Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Mileage
Features
Exterior
Alloy Wheels
Sunroof/Moonroof
LED Headlights
Seating
Cooled Seats
Heated Seats
Leather Seats
Memory Seat
Convenience
Keyless Start
HomeLink
Navigation System
Remote Start
Power Liftgate
USB Port
Safety
Backup Camera
Automatic Emergency Braking
Blind Spot Monitor
Brake Assist
Stability Control
Lane Departure Warning
Rear Cross Traffic Alert
Features
- 12V power outlets 4 12V power outlets
- 19 Speakers
- 20in Premium Painted Aluminum Wheels
- 3-point seatbelt Rear seat center 3-point seatbelt
- 3.65 Axle Ratio
- 360 Degree Camera
- 4-Wheel Disc Brakes
- 4WD type Automatic full-time AWD
- 8in LCD Touch Screen
- ABS Brakes 4-wheel antilock (ABS) brakes
- ABS Brakes Four channel ABS brakes
- ABS brakes
- AM/FM radio: SiriusXM
- Accessory power Retained accessory power
- Active Park Assist
- Adaptive headlights Directionally adaptive headlights
- Adaptive suspension
- Air Conditioning
- Air conditioning Yes
- All Wheel Drive
- All-in-one key All-in-one remote fob and ignition key
- Alloy wheels
- Alternator Type Alternator
- Ambient lighting
- Amplifier
- Antenna Integrated roof audio antenna
- App Link Smart device integration SYNC 3 AppLink smart device app link
- Appliques - Ziricote Wood
- Armrests front center Front seat center armrest
- Armrests rear Rear seat center armrest
- Auto door locks Auto-locking doors
- Auto headlights Auto on/off headlight control
- Auto-dimming Rear-View mirror
- Auto-dimming door mirror driver Auto-dimming driver side mirror
- Auto-dimming door mirrors
- Automatic Emergency Braking
- Automatic brake hold
- Automatic temperature control
- Aux input jack Auxiliary input jack
- Backup Camera
- Basic warranty 48 month/50
- 000 miles
- Battery charge warning
- Battery run down protection
- Battery type Lead acid battery
- Beverage holders Front beverage holders
- Beverage holders rear Rear beverage holders
- Blind Spot Monitor
- Blind spot BLIS blind spot warning
- Blind spot sensor: BLIS warning
- Body panels Fully galvanized steel body panels with side impact beams
- Bodyside cladding Black bodyside cladding
- Bodyside insert Chrome bodyside insert
- Brake Assist
- Brake assist
- Brake assist system
- Brake type 4-wheel disc brakes
- Bumpers front Body-colored front bumper
- Bumpers rear Body-colored rear bumper
- Bumpers: body-color
- CD Single-disc CD player
- CD location CD player located in the dashboard/instrument panel
- CD player
- CD-R compatible
- Cabin air filter
- Camera Aerial view camera
- Capless fuel filler Easy Fuel capless fuel filler
- Cargo access Power cargo area access release
- Cargo cover Roll-up cargo cover
- Cargo floor type Carpet cargo area floor
- Cargo light Cargo area light
- Cargo mats Carpet and rubber cargo mat
- Cargo tie downs Cargo area tie downs
- Child door locks Manual rear child safety door locks
- Climate control Automatic climate control
- Clock Digital clock
- Compass
- Compass Display
- Compressor Twin turbo
- Concealed cargo storage Cargo area concealed storage
- Configurable instrumentation gauges
- Console insert material Simulated wood console insert
- Convex spotter Driver and passenger convex spotter mirrors
- Cooled Driver Seat
- Cooled Passenger Seat
- Cooled front seats Ventilated driver and front passenger seats
- Corrosion perforation warranty 60 month/unlimited
- Cruise control Cruise control with steering wheel mounted controls
- Cylinder head material Aluminum cylinder head
- Dashboard material Leather upholstered dashboard
- Day/Night rearview mirror
- Delay off headlights Delay-off headlights
- Delay-off headlights
- Digital signal processor
- Door ajar warning Rear cargo area ajar warning
- Door bins front Driver and passenger door bins
- Door bins rear Rear door bins
- Door handle material Body-colored door handles
- Door locks Power door locks with 2 stage unlocking
- Door mirror style Body-colored door mirrors
- Door mirror type Standard style side mirrors
- Door mirrors Power door mirrors
- Door panel insert Simulated wood door panel insert
- Door trim insert Leatherette door trim insert
- Drive type All-wheel drive
- Driver door bin
- Driver foot rest
- Driver information center
- Driver lumbar Driver seat with 2-way power lumbar
- Driver seat direction Driver seat with 8-way directional controls
- Driver vanity mirror
- Dual Climate Control
- Dual front impact airbags
- Dual front side impact airbags
- Dual-zone front climate control
- Electronic Stability Control
- Electronic parking brake
- Electronic stability control AdvanceTrac w/RSC electronic stability control system with anti-roll
- Emergency SOS Capable SYNC 3 911 Assist emergency SOS system via mobile device
- Emergency communication system: SYNC 3 911 Assist
- Emissions ULEV II emissions
- Emissions tiers Tier 2 Bin 5 emissions
- Engine Configuration EcoBoost V6
- Engine EcoBoost 2.7L V-6 gasoline direct injection
- DOHC
- variable valve control
- twin turbo
- premium unleaded
- engine with 335HP
- Engine Location Front mounted engine
- Engine Mounting direction Transverse mounted engine
- Engine Short EcoBoost 2.7L V-6 DOHC
- Engine block material Iron engine block
- Engine cooler Engine oil cooler
- Engine temperature warning
- Engine/electric motor temperature gauge
- Equipment Group 800A
- Exterior Parking Camera Rear
- External door locks SecuriCode external keypad door lock control
- External memory SYNC external memory control
- First-row sunroof First and second-row sliding and tilting glass sunroof with express open/close activation sunshade
- First-row windows Power first-row windows
- Floor Carpet/Mats - Espresso
- Floor console Full floor console
- Floor console storage Covered floor console storage
- Floor coverage Full floor coverage
- Floor covering Full carpet floor covering
- Floor mats Carpet front and rear floor mats
- Fob engine controls Smart key with hands-free access and push button start
- Fog lights Front fog lights
- Folding door mirrors Power folding door mirrors
- Folding rear seats 60-40 folding rear seats
- Four wheel independent suspension
- Front Bucket Seats
- Front Center Armrest
- Front Park Aid Sensors
- Front anti-roll Front anti-roll bar
- Front anti-roll bar
- Front camera Front mounted camera
- Front dual zone A/C
- Front fog lights
- Front head restraint control Manual front seat head restraint control
- Front head restraints Height and tilt adjustable front seat head restraints
- Front impact airbag driver Driver front impact airbag
- Front impact airbag passenger Passenger front impact airbag
- Front passenger lumbar Front passenger seat with 2-way power lumbar
- Front reading lights
- Front seat upholstery Leather front seat upholstery
- Front seatback upholstery Leatherette front seatback upholstery
- Front side impact airbag driver Seat mounted side impact driver airbag
- Front side impact airbag passenger Seat mounted side impact front passenger airbag
- Fuel Type Premium unleaded
- Fully automatic headlights
- Garage door opener HomeLink garage door opener
- Garage door transmitter: HomeLink
- Glove box Illuminated glove box
- Grille style Chrome grille
- Handsfree Bluetooth handsfree wireless device connectivity
- Headlight type Projector beam headlights
- Headlights LED low and high beam headlights
- Headlights on reminder
- Headliner - Espresso Alcantara Suede
- Headliner coverage Full headliner coverage
- Headliner material Alcantara simulated suede headliner material
- Heated Seats
- Heated door mirrors
- Heated door mirrors Heated driver and passenger side door mirrors
- Heated front seats
- Heated front seats Heated driver and front passenger seats
- Height adjustable seatbelts Front height adjustable seatbelts
- High mount stop light High mounted center stop light
- Hill start assist
- Ignition Spark ignition system
- Ignition type Push-button
- Illuminated entry
- Illuminated glove box
- Illuminated ignition switch
- Immobilizer SecuriLock immobilizer
- Indulgence Theme
- Inflatable seatbelts Inflatable rear seatbelts
- Inflatable seatbelts number 2 inflatable seatbelts
- Instrumentation display Digital/analog instrumentation display
- Integrated navigation Integrated navigation system
- Interior accents Chrome and metal-look interior accents
- Interior courtesy lights Fade interior courtesy lights
- Internet access SYNC Services full service internet access
- Key in vehicle warning
- Keyfob cargo controls Keyfob trunk control
- Keyfob keyless entry
- Keyfob remote start
- Keyfob sunroof controls Keyfob sunroof/convertible roof control
- Keyfob window controls Keyfob window control
- Keyless Entry
- Keyless Start
- Knee airbag
- Knee airbag Driver side knee airbag
- LED brake lights
- Laminated window Laminated side window glass
- Lane Departure Warning
- Leather Seats
- Leather Wrapped Interior - Ganache
- Left camera Left side camera
- License Plate Bracket
- License plate front bracket Front license plate bracket
- Linking-L Perforation Leather Heated/Cooled Seats
- Lock-up transmission
- Locking hub control Permanent locking hub control
- Low level warnings Low level warning for fuel
- washer fluid and brake fluid
- Low tire pressure warning
- Maintenance warranty 48 month/50
- 000 miles
- Memory Seat
- Memory seat
- Memory settings Memory settings include: door mirrors and steering wheel
- Navigation System
- Noise cancellation Active noise cancellation
- Number of airbags 7 airbags
- Number of doors 4 doors
- Number of first-row screens 3 total number of 1st row displays
- Number of memory settings 2 memory settings
- Occupancy sensor Airbag occupancy sensor
- Occupant sensing airbag
- Oil pressure warning
- One-touch down window Front and rear one-touch down windows
- One-touch up window Front and rear one-touch up windows
- Outside temperature display
- Overdrive transmission
- Overhead airbag
- Overhead airbags Safety Canopy System curtain first and second-row overhead airbags
- Overhead console
- Overhead console Mini overhead console
- Overhead console storage
- Paint Single stage paint
- Panel insert Simulated wood instrument panel insert
- Panic alarm
- Parking sensors Front and rear parking sensors
- Passenger door bin
- Passenger doors rear left Conventional left rear passenger door
- Passenger doors rear right Conventional right rear passenger door
- Passenger seat direction Front passenger seat with 8-way directional controls
- Passenger vanity mirror
- Perimeter approach lighting Remote activated perimeter approach lighting
- Power Driver Seat
- Power Liftgate
- Power door mirrors
- Power driver seat
- Power driver seat controls Driver seat power reclining
- lumbar support
- cushion extension
- cushion tilt
- fore/aft control and height adjustable control
- Power moonroof
- Power passenger seat
- Power passenger seat controls Passenger seat power reclining
- lumbar support
- cushion extension
- cushion tilt
- fore/aft control and height adjustable control
- Power steering
- Power windows
- Powertrain type ICE
- Powertrain warranty 72 month/70
- 000 miles
- Primary display size 8 inch primary display
- Primary display touchscreen Primary monitor touchscreen
- RDS Radio data system (RDS)
- Radiator
- Radio AM/FM/digital/SiriusXMsatellite
- Radio data system
- Radio: Revel Ultima System w/HD Radio/Single-CD
- Real time traffic SiriusXM Traffic real-time traffic
- Rear Cross Traffic Alert
- Rear Parking Sensors
- Rear Spoiler
- Rear Springs Regular grade rear springs
- Rear anti-roll Rear anti-roll bar
- Rear anti-roll bar
- Rear camera Rear mounted camera
- Rear cargo door Power liftgate rear cargo door
- Rear collision warning
- Rear console climate control ducts
- Rear head restraint control 3 rear seat head restraints
- Rear head restraint control Manual rear seat head restraint control
- Rear head restraints Height adjustable rear seat head restraints
- Rear reading lights
- Rear seat center armrest
- Rear seat direction Front facing rear seat
- Rear seat folding position Fold forward rear seatback
- Rear seat upholstery Leather rear seat upholstery
- Rear seatback upholstery Carpet rear seatback upholstery
- Rear seats Split-bench rear seat
- Rear seats fixed or removable Fixed rear seats
- Rear under seat ducts Rear under seat climate control ducts
- Rear window defroster
- Rear window wiper
- Rear windshield Fixed rear windshield
- Rear windshield wipers
- Rearview mirror Auto-dimming rear view mirror
- Reclining rear seats Manual reclining rear seats
- Remote keyless entry
- Remote panic alarm
- Restricted driving mode/alerts MyKey restricted driving mode/alerts
- Right camera Right side camera
- Roadside warranty Unlimited months/unlimited
- Running lights LED daytime running lights
- SYNC 3
- Satellite trial 6 month satellite trial subscription
- Seatback storage pockets 2 seatback storage pockets
- Seatbelt pretensioners Front seatbelt pretensioners
- Seatbelt pretensioners number 2 seatbelt pre-tensioners
- Seating capacity 5
- Second-row windows Power second-row windows
- Security system
- Seek scan
- Sequential shift control SelectShift Sequential shift control
- Service interval warning Service interval indicator
- Shock absorbers Gas-pressurized shock absorbers
- Spare tire Compact spare tire with steel wheel
- Spare tire location Spare tire mounted under the cargo floor
- Speakers Revel speakers
- Speakers number 19 speakers
- Special paint Monotone paint
- Speed control
- Speed sensitive volume
- Speed sensitive wipers
- Speed-Sensitive Wipers
- Split folding rear seat
- Split front seats Bucket front seats
- Spoiler
- Spoiler Rear lip spoiler
- Springs front Front coil springs
- Springs rear Rear coil springs
- Stability Control
- Steering Electric power-assist steering system
- Steering mounted audio control Steering wheel mounted audio controls
- Steering mounted climate control Steering wheel mounted climate controls
- Steering type Rack-pinion steering
- Steering wheel material Leather and metal-look steering wheel
- Steering wheel memory
- Steering wheel mounted A/C controls
- Steering wheel mounted audio controls
- Steering wheel telescopic Power telescopic steering wheel
- Steering wheel tilt Power tilting steering wheel
- Sunroof/Moonroof
- Suspension Standard ride suspension
- Suspension auto correcting Adaptive ride suspension
- Suspension control Automatic suspension ride control with driver control
- Suspension ride type front Independent front suspension
- Suspension ride type rear Independent rear suspension
- Suspension type front Strut front suspension
- Suspension type rear Multi-link rear suspension
- Tachometer
- Tailgate control Tailgate/power door lock
- Tailpipe Stainless steel dual exhaust with chrome tailpipe finisher
- Technology Package
- Telescoping steering wheel
- Temperature display Exterior temperature display
- Third-row windows Fixed third-row windows
- Tilt steering wheel
- Tinted windows Deep tinted windows
- Tires P245/50VR20 AS BSW front and rear tires
- Traction Control
- Traction control
- Traction control All-speed ABS and driveline traction control
- Transmission 6-speed automatic
- Transmission Type Automatic
- Transmission electronic control
- Trip computer
- Trip odometer
- Trunk hatch Trunk/hatch auto-latching
- Trunk lid trim Plastic trunk lid trim
- Turbocharged
- Turn signal in door mirrors Turn signal indicator in door mirrors
- Turn signal indicator mirrors
- USB Port
- USB ports 2 USB ports
- Variable panel light Variable instrument panel light
- Variably intermittent wipers
- Ventilated brakes Front and rear ventilated disc brakes
- Ventilated front seats
- Visor driver mirror Driver visor mirror
- Visor illuminated driver mirror Illuminated driver visor mirror
- Visor illuminated passenger mirror Illuminated passenger visor mirror
- Visor passenger mirror Passenger visor mirror
- Voice activated audio Voice activated audio controls
- Voice activated climate control Voice-activated climate control
- WIFI Hotspot
- Wheels 21 x 10-inch front and rear polished aluminum wheels
- Window Trim Chrome side window trim
- Windshield trim Black windshield trim
- Wipers Variable intermittent front windshield wipers
- Wireless streaming Wireless audio streaming
Seller's Comments
Audi Rancho Mirage is delighted to showcase, this Pre-Owned 2016 Lincoln MKX Black Label Dressed in an elegant Dark Brown and with just 83,502 miles to its name, this luxury SUV delivers a refined blend of comfort, technology, and performance.
The MKX presents a sophisticated exterior design, with smooth lines and a bold front grille that give it a commanding yet upscale presence on the road.
Inside, the Ganache interior offers a rich, premium environment, highlighted by high-quality materials and thoughtful craftsmanship that elevate every drive.
Engine and Performance: Powered by a twin-turbocharged 2.7L V6 EcoBoost engine, producing an impressive 335 horsepower and 380 lb-ft of torque, paired with a 6-speed automatic transmission and all-wheel drive, this MKX delivers smooth power and confident handling in all conditions.
Key Features:
Black Label Trim offering exclusive luxury finishes and premium materials
All-Wheel Drive for enhanced traction and control
Premium Interior Appointments with refined craftsmanship
Advanced Infotainment System for connectivity and convenience
Smooth Ride Quality with comfort-focused engineering
This 2016 Lincoln MKX Black Label is the perfect combination of luxury and capability, available now at Audi Rancho Mirage.
Audi Rancho Mirage is a member of the indiGO Auto Group. Our dealership features a beautiful redesigned showroom, fully staffed factory certified service center, parts department, finance department, detail department, and accessories boutique. Allow us to also help arrange transportation of your new car directly to your home anywhere in the world. Trade-in proposals are always welcome. If you like this vehicle and have questions, simply call, email, or drop by our location at 71265 CA-111, Rancho Mirage, CA 92270. We invite you to Activate Your Ownership with us today!
View More
71265 Highway 111
Rancho MIrage, California 92270
(760) 993-3192
Looking for someone to work with?
View salespeople at this dealershipDealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.

