Powered by Cars.com

2024 Volkswagen Atlas

$32,074used

Contact Dealership

Basics

Condition

used

Interior Color

french roast

Exterior Color

silver bird metallic

Drivetrain

All-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

2.0L I4 16V GDI DOHC Turbo

VIN

1V2BR2CA6RC526688

Stock Number

BF32059

Mileage

30,459

Features

Exterior

Alloy Wheels

Sunroof/Moonroof

Tow Hitch

Safety

Brake Assist

Stability Control

Backup Camera

Seating

Third Row Seating

Memory Seat

Heated Seats

Leather Seats

Convenience

Adaptive Cruise Control

Heated Steering Wheel

Navigation System

Power Liftgate

Remote Start

View Full List of Features

Seller's Comments

BUYBACK! NO HIDDEN FEES! ALL RECONDITIONING COSTS ARE FULLY INCLUDED IN OUR PRICES. RE-PURCHASED BY THE MANUFACTURER! DISCOUNTED PRICE: MOST VEHICLES COME WITH A 12-MONTH MANUFACTURER WARRANTY! SEE BELOW FOR ADDITIONAL DETAILS. ONE OWNER! PANORAMIC ROOF, NAVIGATION, HEAD-UP DISPLAY, BLIND SPOT MONITORS AND 12 TOUCHSCREEN! The 2024 Volkswagen Atlas SEL 4MOTION® is a premium, family-focused three-row SUV that perfectly combines advanced turbocharged performance and standard all-wheel-drive capability with an upscale, technology-rich cabin layout. At Bill Luke, proudly family-owned and serving our community with reliable automotive excellence since 192. We love featuring premium SUVs engineered for ultimate family travel, and this 2024 Volkswagen Atlas SEL is a spectacular example. Delivering confident, all-weather traction via standard 4MOTION® All-Wheel Drive, this versatile three-row vehicle comes upgraded with the highly desirable 2nd-Row Dual Captain's Chairs Package, offering first-class passenger comfort and effortless access to the rear seats. The executive cabin keeps everyone relaxed under a standard Power Tilting & Sliding Panoramic Sunroof while boasting high-tech features like a built-in Head-Up Display (HUD) and the customizable Volkswagen Digital Cockpit Pro. Complete with top-tier driver protection from the integrated IQ.DRIVE® Advanced Driver Assistance suitefeaturing Adaptive Cruise Control and Lane Assistthis elegant cruiser provides the perfect blend of modern luxury workspace and everyday functionality for the entire family. *THE MANUFACTURE REPURCHASED THIS VEHICLE DUE TO A COMPLAINT FROM THE ORIGINAL OWNER. DESPITE HAVING RESOLVED THE ISSUE, THIS VEHICLE IS KNOWN AS A MANUFACTURER BUYBACK. ALL MANUFACTURER WARRANTIES REMAIN INTACT AND EXTENDED WARRANTIES ARE AVAILABLE* Bill Luke Tempe is a family owned and operated business that has done business the right way since 1927. You can buy with confidence! Unlike our competitors, our RECONDITIONING COSTS are INCLUDED in the sales price. Bill Luke Tempe's price is based on Kelley Blue Book Price AdvisorTM - which allows you to see what other Arizona residents have paid for the same year, make and model of vehicle while considering vehicle mileage. See dealer for details or visit www.billluketempe.com to see the difference for yourself!

Contact Bill Luke Tempe

Call (623) 352-0911

Bill Luke Tempe
3.3 |
570 Lifetime Reviews

7833 South Autoplex Loop

Tempe, Arizona 85284

(623) 352-0911

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

used 2025 Volkswagen Atlas car, priced at $32,072
2025 Volkswagen Atlas
used
Pure White exterior
Automatic
Front-wheel Drive
used 2024 Volkswagen Atlas car, priced at $30,474
2024 Volkswagen Atlas
used
Pure White exterior
Automatic
Front-wheel Drive

*By submitting my contact information, I authorize you to contact me via phone, email, or SMS text messaging. Internet pricing on new vehicles may include factory rebates. Incentivized rates may affect incentives and/or pricing. All advertised prices are for retail purchases and may not be available for commercial, fleet, broker, exporter, wholesaler, lease, or other non-retail transactions. Prices do not include tax, title, and license fees. Offer valid only on vehicles in stock at the time of purchase, and prices expire at midnight on the date displayed. Residency and other restrictions may apply. A second key, floor mats, and the owner’s manual may not be available on all pre-owned vehicles. We have made every effort to ensure the accuracy of the data displayed. The dealer is not responsible for errors, typos, or omissions. All inventory is subject to prior sale, and all prices are subject to change. Vehicles may vary from stock photos shown. Please see the dealer to confirm details, availability, and pricing.

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.