Powered by Cars.com

2026 Ford F-250

$76,224new

MSRP: $83,625

Contact Dealership

Basics

Condition

new

Interior Color

black onyx

Exterior Color

avalanche

Drivetrain

Four-wheel Drive

Transmission

Automatic

Fuel

Diesel

Engine

Powerstroke 6.7L V-8 diesel direct injection, intercooled turbo,

VIN

1FT8W2BT1TEC05127

Stock Number

TEC05127

Mileage

14

Features

Entertainment

Premium Sound System

Exterior

Alloy Wheels

LED Headlights

Tow Hitch

Seating

Cooled Seats

Leather Seats

Heated Seats

Memory Seat

Safety

Automatic Emergency Braking

Backup Camera

Blind Spot Monitor

Brake Assist

Stability Control

Lane Departure Warning

Rear Cross Traffic Alert

Convenience

Keyless Start

Heated Steering Wheel

Navigation System

Remote Start

Tow Hooks

USB Port

HomeLink

View Full List of Features

Seller's Comments

Engine: 6.7L 4V Ohv Power Stroke V8 Turbo Diesel B20,Lariat Premium Package,Fx4 Off-Road Package,Navigation System,Securicode Keyless Entry Keypad (Driver'S Side),Electronic-Locking W/3.31 Axle Ratio,Avalanche,Tires: Lt275/70Rx18E Bsw A/T (4),Engine Block Heater,Upfitter Switches (6),Dual Agm 68 Ah Battery,Lane Keeping Assist,Keyless Start,Cooled Front Seat(S),Black Onyx; Front Activex Trimmed 40/Console/40 Seats,Front License Plate Bracket,Order Code 608A,Transmission: Torqshift 10-Speed Automatic

Contact AutoNation Ford Frisco

Call (972) 763-5523

AutoNation Ford Frisco
4.4 |
1,542 Lifetime Reviews

6850 State Hwy 121

Frisco, Texas 75034

(972) 763-5523

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

new 2026 Ford F-250 car, priced at $65,224
2026 Ford F-250
new
Avalanche exterior
Automatic
Four-wheel Drive
new 2026 Ford F-250 car, priced at $101,600
2026 Ford F-250
new
Star White Metallic Tri-Coat exterior
Automatic
Four-wheel Drive
new 2026 Ford F-250 car, priced at $65,224
2026 Ford F-250
new
Agate Black Metallic exterior
Automatic
Four-wheel Drive
used 2021 Ford F-250 car, priced at $60,220
2021 Ford F-250
used
Star White Metallic Tri-Coat exterior
Automatic
Four-wheel Drive
used 2022 Ford F-250 car, priced at $64,114
2022 Ford F-250
used
Star White Metallic Tri-Coat exterior
Automatic
Four-wheel Drive
new 2026 Ford F-250 car, priced at $100,940
2026 Ford F-250
new
Star White Metallic Tri-Coat exterior
Automatic
Four-wheel Drive

Accessories & color may vary. Dealer not responsible for errors or omissions. New vehicle pricing may already include applicable manufacturer incentives which may expire at any time & are subject to incentive qualification criteria & requirements. Manufacturer incentive data & vehicle features is provided by third parties & believed to be accurate as of the time of publication. Please contact the store by email or phone for details & availability of incentives. Sales tax or other taxes tag title registration fees government fees not included. $225 Dealer Documentary Fee not included in quoted price. Pre-owned vehicle Money-Back Guarantee is valid for 5 days or 250 miles whichever comes first. Subject to certain terms and conditions. See store for details. Some restrictions apply. Vehicles may have unrepaired safety recalls. You can check recall status by VIN at www.safercar.gov.

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.