Powered by Cars.com

2026 Ford Escape

$28,705new

MSRP: $35,080

Contact Dealership

Basics

Condition

new

Interior Color

ebony

Exterior Color

gray metallic

Drivetrain

All-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

1.5L I3 12V PDI DOHC Turbo

VIN

1FMCU9GN6TUA16154

Stock Number

1659

Mileage

11

Features

Exterior

Alloy Wheels

Convenience

USB Port

Heated Steering Wheel

Keyless Start

Power Liftgate

Remote Start

Safety

Backup Camera

Brake Assist

Stability Control

Automatic Emergency Braking

Lane Departure Warning

Rear Cross Traffic Alert

View Full List of Features

Seller's Comments

Experience the perfect blend of style and capability with this 2026 Ford Escape Active. Designed to conquer any adventure, this versatile SUV offers a commanding presence on the road. - No Hidden Fees of Any Kind - 4WD/AWD - Apple CarPlay/Android Auto - Backup Camera - Keyless Entry - Keyless Start - POWER LIFTGATE - COLD WEATHER PACKAGE (Includes Heated Front Row Seats, Heated Sideview Mirrors, Remote Starter System, Heated Steering Wheel) - MINI STEEL SPARE WHEEL (T155/70D17 spare tire and jack) - Cold Weather Package - Equipment Group 200A - Radio: AM/FM Stereo with SiriusXM 360L - SYNC 4 with 8 LCD Capacitive Touchscreen and Swipe Capability - 3.81 Axle Ratio - Heated Sideview Mirrors - Heated Steering Wheel - Unique Cloth Front Bucket Seats - Ford App - Remote Starter System - 4-Way Manual Front Passenger Seat - 6-Way Manual Driver Seat - Heated Front Row Seats - Wheels: 17 Shadow Silver-Painted Aluminum This 2026 Ford Escape Active offers the perfect balance of style, technology, and capability. With its sleek exterior design, advanced connectivity features, and premium cold weather amenities, this SUV is ready to take on any adventure. Experience the thrill of confident all-wheel drive performance and the convenience of a power liftgate, remote start, and heated steering wheel. Discover the ultimate in versatility and comfort with the 2026 Ford Escape Active. Schedule a test drive today and unlock the possibilities. Price includes: $1000 - SSE Down Payment Assistance. Exp. 08/31/2026 $4000 - Model Year Closeout Bonus Cash - Escape Gas/Hybrid. Exp. 09/30/2026

Contact Pettijohn Ford of Trenton

Call (660) 359-4461

Pettijohn Ford of Trenton
0 |
2 Lifetime Reviews

1406 Oklahoma Ave

Trenton, Missouri 64683

(660) 359-4461

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

used 2022 Ford Escape car, priced at $20,500
2022 Ford Escape
used
Oxford White exterior
Automatic
All-wheel Drive
new 2026 Ford Escape car, priced at $28,245
2026 Ford Escape
new
Silver Metallic exterior
Automatic
All-wheel Drive
used 2020 Ford Escape car, priced at $17,500
2020 Ford Escape
used
Black Metallic exterior
Automatic
All-wheel Drive

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.