Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Mileage
Features
Seating
Leather Seats
Heated Seats
Memory Seat
Exterior
Sunroof/Moonroof
LED Headlights
Alloy Wheels
Convenience
Adaptive Cruise Control
Keyless Start
Heated Steering Wheel
Navigation System
Remote Start
Power Liftgate
USB Port
Safety
Automatic Emergency Braking
Backup Camera
Blind Spot Monitor
Brake Assist
Stability Control
Lane Departure Warning
Rear Cross Traffic Alert
Features
- 12V power outlets 2 12V power outlets
- 18-Inch x 8.0-Inch Polished / Painted Alum Wheels
- 265/60R18 BSW All-Season LRR Tires
- 3-point seatbelt Rear seat center 3-point seatbelt
- 3.6L V6 24V VVT Pentastar Engine with Stop / Start
- 4WD type Quadra-Trac I automatic full-time 4WD
- 5.5 Additional Gallons of Gas
- 50 State Emissions
- 8-Speed Automatic 850RE Transmission
- ABS Brakes 4-wheel antilock (ABS) brakes
- ABS Brakes Four channel ABS brakes
- Accessory power Retained accessory power
- Active Noise Control System
- Adaptive Cruise Control
- Adaptive cruise control Adaptive Cruise Control w/Stop & Go
- Air conditioning Yes
- All-in-one key All-in-one remote fob and ignition key
- Alternator Type Alternator
- Altimeter
- Ambient lighting
- Android Auto
- Antenna Integrated roof audio antenna
- Apple CarPlay
- Armrests front center Front seat center armrest
- Armrests front storage Front seat armrest storage
- Auto door locks Auto-locking doors
- Auto headlights Auto on/off headlight control
- Auto high-beam headlights
- Automatic Emergency Braking
- Aux input jack Auxiliary input jack
- Auxiliary battery
- Backup Camera
- Basic warranty 36 month/36
- 000 miles
- Battery charge warning
- Battery run down protection
- Battery type Lead acid battery
- Beverage holders Illuminated front beverage holders
- Beverage holders rear Rear beverage holders
- Blind Spot Monitor
- Blind spot Blind Spot Detection
- Body panels Galvanized steel/aluminum body panels with side impact beams
- Bodyside cladding Black bodyside cladding
- Brake Assist
- Brake assist system Predictive brake assist system
- Brake type 4-wheel disc brakes
- Bright White Clear-Coat Exterior Paint
- Bulb warning Bulb failure warning
- Bumper insert Chrome front and rear bumper inserts
- Bumper rub strip front Black front bumper rub strip
- Bumper rub strip rear Black rear bumper rub strip
- Bumpers front Body-colored front bumper
- Bumpers rear Body-colored rear bumper
- Cabin air filter
- Capless fuel filler
- Capri Leatherette Seats
- Cargo access Power cargo area access release
- Cargo floor type Carpet cargo area floor
- Cargo light Cargo area light
- Cargo tie downs Cargo area tie downs
- Child door locks Manual rear child safety door locks
- Climate control Automatic climate control
- Clock Digital clock
- Compass
- Concealed cargo storage Cargo area concealed storage
- Configurable instrumentation gauges
- Console insert material Piano black console insert
- Corrosion perforation warranty 60 month/unlimited
- Cruise control Cruise control with steering wheel mounted controls
- Customer Preferred Package 22E
- Customer Preferred Package 2TE
- Cylinder head material Aluminum cylinder head
- DRL preference setting
- Day/Night rearview mirror
- Delay off headlights Delay-off headlights
- Distance alert Following distance alert
- Door ajar warning Rear cargo area ajar warning
- Door bins front Driver and passenger door bins
- Door bins rear Rear door bins
- Door handle material Body-colored door handles
- Door locks Power door locks with 2 stage unlocking
- Door mirror style Black door mirrors
- Door mirror type Standard style side mirrors
- Door mirrors Power door mirrors
- Door panel insert Simulated wood and metal-look door panel insert
- Door trim insert Vinyl door trim insert
- Drive type Four-wheel drive
- Driver foot rest
- Driver information center
- Driver lumbar Driver seat with 4-way power lumbar
- Driver seat direction Driver seat with 8-way directional controls
- Driver selectable steering effort
- Drivetrain selectable Selec-Terrain driver selectable drivetrain mode
- Dual Climate Control
- Dual-Pane Panoramic Sunroof
- Dual-zone front climate control
- Eco Feedback ECO feedback display gauge
- Electronic parking brake
- Electronic stability control Electronic stability control system with anti-roll
- Emergency SOS Capable Vehicle integrated emergency SOS system
- Emissions LEV3-SULEV30 emissions
- Emissions tiers Tier 3 Bin 30 emissions
- Engine Cylinders Pentastar V6
- Engine Location Front mounted engine
- Engine Mounting direction Longitudinal mounted engine
- Engine Pentastar 3.6L V-6 DOHC
- variable valve control
- regular unleaded
- engine with 293HP
- Engine block material Aluminum engine block
- Engine cooler Engine oil cooler
- Engine hour meter
- Engine temperature warning
- Engine/electric motor temperature gauge
- External memory Uconnect external memory control
- Fenders Black fender flares
- First-row sunroof First and second-row sliding and tilting glass sunroof with express open/close activation sunshade
- First-row windows Power first-row windows
- Floor console Full floor console
- Floor console storage Covered floor console storage
- Floor coverage Full floor coverage
- Floor covering Full carpet floor covering
- Floor mats Carpet front and rear floor mats
- Fob engine controls Smart key with hands-free access and push button start
- Fog lights LED front fog lights
- Folding door mirrors Manual folding door mirrors
- Folding rear seats 60-40 folding rear seats
- Forward collision warning Full Speed Forward Collision Warning Plus
- Four Wheel Drive
- Front anti-roll Front anti-roll bar
- Front anti-whiplash head restraints Anti-whiplash front seat head restraints
- Front head restraint control Manual front seat head restraint control
- Front head restraints Height and tilt adjustable front seat head restraints
- Front impact airbag driver Driver front impact airbag
- Front impact airbag passenger Passenger front impact airbag
- Front passenger lumbar Front passenger seat with 4-way power lumbar
- Front reading lights
- Front seat upholstery Leatherette front seat upholstery
- Front seatback upholstery Plastic front seatback upholstery
- Front side impact airbag driver Seat mounted side impact driver airbag
- Front side impact airbag passenger Seat mounted side impact front passenger airbag
- Fuel Fill / Battery Charge
- Fuel Type Regular Unleaded
- Fuel door lock Power fuel door lock
- Full gauge cluster screen
- Garage door opener
- Gauge cluster display size (inches) Gauge cluster display size: 10.25
- Gearshifter material Chrome gear shifter material
- Global Black / Wicker Beige Interior Colors
- Glove box Illuminated locking glove box
- Grille style Chrome grille
- Handsfree Uconnect w/Bluetooth handsfree wireless device connectivity
- Headlight type Reflector headlights
- Headlights LED low and high beam headlights
- Headlights on reminder
- Headliner coverage Full headliner coverage
- Headliner material Cloth headliner material
- Heated Seats
- Heated Steering Wheel
- Heated door mirrors Heated driver and passenger side door mirrors
- Heated front seats Heated driver and front passenger seats
- Heated rear seats
- Heated steering wheel
- Heated wiper area Heated rear wiper park
- Height adjustable seatbelts Front height adjustable seatbelts
- High mount stop light High mounted center stop light
- Hill start assist
- Ignition Spark ignition system
- Illuminated entry
- Illuminated glove box
- Immobilizer Sentry Key immobilizer
- Inclinometer
- Instrumentation display Digital/analog instrumentation display
- Integrated navigation Integrated navigation system with voice activation
- Interior 120V AC power outlets 1 interior 120V AC power outlet
- Interior accents Chrome and metal-look interior accents
- Interior courtesy lights Fade interior courtesy lights
- Internet access 4G LTE Wi-Fi Hot Spot mobile hotspot internet access
- Internet radio capability
- Key in vehicle warning
- Keyfob cargo controls Keyfob trunk control
- Keyfob keyless entry
- Keyfob remote start
- Keyless Entry
- Keyless Start
- Knee airbag Driver and passenger side knee airbag
- LED brake lights
- Laminated window Laminated side window glass
- Lane departure Active Lane Management
- Limited Slip Center Differential
- Limited slip differential Brake Limited Differential brake actuated limited slip differential
- Lock-up transmission
- Locking hub control Permanent locking hub control
- Low level warnings Low level warning for coolant
- fuel
- washer fluid and brake fluid
- Low tire pressure warning Tire specific low air pressure warning
- Maintenance warranty 24 month/unlimited
- Memory Seat
- Memory settings Memory settings include: door mirrors and audio controls
- Mobile app access
- Model Year Tracking
- Multiple headlights Multiple enclosed headlights
- Navigation System
- Noise cancellation Active noise cancellation
- Normal Duty Suspension
- Number of airbags 8 airbags
- Number of beverage holders 8 beverage holders
- Number of doors 4 doors
- Number of first-row screens 2 total number of 1st row displays
- Number of memory settings 2 memory settings
- Occupancy sensor Airbag occupancy sensor
- Oil pressure gauge
- Oil pressure warning
- Oil temperature gauge
- One-touch down window Driver and passenger one-touch down windows
- One-touch up window Driver and passenger one-touch up windows
- Over the air updates
- Overdrive transmission
- Overhead airbags Curtain first and second-row overhead airbags
- Overhead console Mini overhead console
- Overhead console storage
- Paint Non-metallic paint
- Panel insert Simulated wood and metal-look instrument panel insert
- Parking sensors ParkSense with Stop rear parking sensors
- Passenger doors rear left Conventional left rear passenger door
- Passenger doors rear right Conventional right rear passenger door
- Passenger seat direction Front passenger seat with 8-way directional controls
- Pedestrian detection Pedestrian/Cyclist Emergency Braking
- Perimeter approach lighting Remote activated perimeter approach lighting
- Power Driver Seat
- Power driver seat controls Driver seat power reclining
- lumbar support
- cushion tilt
- fore/aft control and height adjustable control
- Power passenger seat controls Passenger seat power reclining
- lumbar support
- cushion tilt
- fore/aft control and height adjustable control
- Powertrain type ICE
- Powertrain warranty 60 month/60
- 000 miles
- Primary display size 10.1 inch primary display
- Primary display touchscreen Primary monitor touchscreen
- RDS Radio data system (RDS)
- Radiator
- Radio AM/FM/digital/SiriusXM with 360Lsatellite
- Real time traffic Connected Travel & Traffic Services real-time traffic
- Real time weather Connected Travel & Traffic Services real-time weather
- Rear Cross Traffic Alert
- Rear Spoiler
- Rear Springs Regular grade rear springs
- Rear anti-roll Rear anti-roll bar
- Rear camera ParkView rear mounted camera
- Rear cargo door Power liftgate rear cargo door
- Rear collision warning Cross Path Detection collision mitigation
- Rear console climate control ducts
- Rear head restraint control 2 rear seat head restraints
- Rear head restraints Fixed rear head restraints
- Rear headliner/pillar ducts Rear headliner/pillar climate control ducts
- Rear reading lights
- Rear seat check warning Rear Seat Reminder rear seat check warning
- Rear seat direction Front facing rear seat
- Rear seat folding position Fold forward rear seatback
- Rear seat upholstery Leatherette rear seat upholstery
- Rear seatback upholstery Carpet rear seatback upholstery
- Rear seats Split-bench rear seat
- Rear seats fixed or removable Fixed rear seats
- Rear window defroster
- Rear window trim Chrome rear window trim
- Rear windshield Fixed rear windshield
- Rear windshield wipers
- Reclining rear seats Manual reclining rear seats
- Remote panic alarm
- Roadside warranty 60 month/60
- 000 miles
- Roof rails
- Running lights LED daytime running lights
- Satellite trial 3 month satellite trial subscription
- Seatback storage pockets 2 seatback storage pockets
- Seatbelt pretensioners Front seatbelt pretensioners
- Seatbelt pretensioners number 2 seatbelt pre-tensioners
- Seating capacity 5
- Second-row windows Power second-row windows
- Security system
- Seek scan
- Selectable Terrain Modes
- Selectable mode transmission Tow/Haul Mode selectable mode transmission
- Sequential shift control Sequential shift with steering wheel controls
- Service interval warning Service interval indicator
- Shock absorbers Gas-pressurized shock absorbers
- Shutters Active grille shutters
- Smart device integration Wireless Apple CarPlay/Android Auto smart device wireless mirroring
- Smart device remote start
- Spare tire Compact spare tire with aluminum wheel
- Spare tire location Spare tire mounted under the cargo floor
- Speakers Alpine performance grade speakers
- Speakers number 6 speakers
- Special paint Monotone paint
- Speed sensitive volume
- Speed sensitive wipers
- Speedometer Redundant digital speedometer
- Split front seats Bucket front seats
- Spoiler Rear lip spoiler
- Springs front Front coil springs
- Springs rear Rear coil springs
- Stability Control
- Start-stop engine Auto stop-start engine
- Steering Electric power-assist steering system
- Steering mounted audio control Steering wheel mounted audio controls
- Steering type Rack-pinion steering
- Steering wheel material Leatherette steering wheel
- Steering wheel telescopic Manual telescopic steering wheel
- Steering wheel tilt Manual tilting steering wheel
- Sunroof/Moonroof
- Suspension Standard ride suspension
- Suspension ride type front Independent front suspension
- Suspension ride type rear Independent rear suspension
- Suspension type front Multi-link front suspension
- Suspension type rear Multi-link rear suspension
- T3AC
- Tachometer
- Tailgate control Tailgate/power door lock
- Tailpipe Stainless steel single exhaust
- Temperature display Exterior temperature display
- Third-row windows Fixed third-row windows
- Tinted windows Deep tinted windows
- Tire pressure Tire Fill Alert programmable tire pressure fill assist
- Tires P265/60TR18 AS BSW front and rear tires
- Towing trailer sway Trailer sway control
- Traction Control
- Traction control Selec-Terrain all-speed ABS and driveline traction control
- Transmission TorqueFlite 8-speed automatic
- Transmission Type Automatic
- Transmission electronic control
- Transmission fluid temperature warning Transmission fluid temp warning
- Transmission temperature gauge Transmission fluid temperature gauge
- Trip computer
- Trip odometer
- Trunk lid trim Plastic trunk lid trim
- Turn signal in door mirrors Turn signal indicator in door mirrors
- Turn signal warning Turn signal on warning
- USB Port
- USB ports 10 USB ports
- Uconnect 5 Nav with 10.1-Inch Touch Screen Display
- Valet key
- Variable panel light Variable instrument panel light
- Vehicle tracker Jeep Connect vehicle tracker
- Ventilated brakes Front and rear ventilated disc brakes
- Visor driver mirror Driver visor mirror
- Visor illuminated driver mirror Illuminated driver visor mirror
- Visor illuminated passenger mirror Illuminated passenger visor mirror
- Visor passenger mirror Passenger visor mirror
- Voice activated audio Voice activated audio controls
- Voice activated climate control Voice-activated climate control
- Voltmeter
- WIFI Hotspot
- Wheels 18 x 8-inch front and rear polished w/painted accents aluminum wheels
- Wicker Beige/Black
- Window Trim Chrome side window trim
- Wipers Variable intermittent front windshield wipers
- Wireless streaming Bluetooth wireless audio streaming
Seller's Comments
Vehicle Details 2025 Jeep Grand Cherokee Limited ?' ready for every road and every plan. This striking SUV pairs a smooth, responsive 3.6L V6 with capable 4WD for confident driving in city traffic or on rougher terrain. The Limited trim balances comfort and utility with premium touches throughout the cabin and thoughtful technological upgrades. Stay connected and entertained with Apple CarPlay and Android Auto, while hands-free Bluetooth keeps calls and music effortless on the move. Built-in navigation guides you precisely to new destinations, and Remote Start lets you warm up or cool down the interior before you step inside. Spacious seating and flexible cargo space make this Jeep Grand Cherokee ideal for weekend adventures, family trips, or daily commuting. Safety-focused features and modern amenities enhance every journey, and durable engineering means this vehicle is ready to serve for years to come. Whether you??re tackling weather, hauling gear, or simply enjoying a refined ride, this 2025 Jeep Grand Cherokee Limited delivers capability without compromise. Schedule a test drive today and experience the blend of performance, comfort, and tech that defines this versatile SUV. Equipment See what's behind you with the back up camera on this mid-size suv. It comes equipped with Android Auto for seamless smartphone integration on the road. This 2025 Jeep Grand Cherokee is pure luxury with a heated steering wheel. The installed navigation system will keep you on the right path. It's Forward Collision Warning system alerts the driver to potential front-end collisions, enhancing safety. This vehicle offers Apple CarPlay for seamless connectivity. Bluetooth technology is built into it, keeping your hands on the steering wheel and your focus on the road. The Jeep Grand Cherokee has auto-adjust speed for safe following. The leather seats in it are a must for buyers looking for comfort, durability, and style. Start this model from inside with remote start. Enjoy the convenience of the power liftgate on the vehicle. This 2025 Jeep Grand Cherokee has four wheel drive capabilities. This model has a V6, 3.6L high output engine. Packages Quick Order Package 22E. Dual-Pane Panoramic Sunroof. **Equipment listed is based on original vehicle build and subject to change. Please confirm the accuracy of the included equipment by calling the dealer prior to purchase.** Additional Information For a limited time, Glenbrook CDJR is offering a minimum of $2000 for any trade-in towards the purchase of any new Chrysler, Dodge, Jeep, or RAM. The trade vehicle must be driven to the dealership there are no tows. This offer cannot be combined with any other offers or coupons. See the dealer for complete details. Manufacturer Incentives Price includes: Guaranteed Incentives: $2,250 - 2025 National Retail Bonus Cash - Exp. 9/30/2025. Contact dealer to verify final pricing.
View More100 W Coliseum Blvd
Fort Wayne, Indiana 46805
(833) 674-1158
Looking for someone to work with?
View salespeople at this dealershipSimilar Vehicles
DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.

