Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Mileage
Features
Exterior
Alloy Wheels
LED Headlights
Convenience
USB Port
Keyless Start
Tow Hooks
Safety
Backup Camera
Brake Assist
Stability Control
Features
- 1st and 2nd row curtain head airbags
- 4 Cylinder Engine
- 4 Door
- 4 USB ports
- 4-Wheel Disc Brakes
- 4-wheel ABS Brakes
- 911 Assist
- A/C
- ABS
- ABS and Driveline Traction Control
- AM/FM Stereo
- Adjustable Steering Wheel
- Aluminum Wheels
- Aluminum spare wheel rim
- Ambient lighting
- Anti-theft alarm system
- Audio controls on steering wheel
- Automatic Headlights
- Automatic Highbeams
- Automatic locking hubs
- Auxiliary Audio Input
- Back-Up Camera
- Black bumpers
- Black grille
- Bluetooth Connection
- Brake Assist
- Braking Assist
- Bucket Seats
- Bucket front seats
- Cargo area light
- Cargo tie downs
- Center Console: Full with locking storage
- Child Safety Locks
- Clock : Digital
- Cloth Seats
- Cloth seat upholstery
- Coil front spring
- Coil rear spring
- Compass
- Conventional Spare Tire
- Convertible Soft Top
- Convertible occupant rollover protection
- Cruise control
- Cruise controls on steering wheel
- Cupholders: Front
- Curb weight: 4
- 467 lbs.
- Daytime running lights
- Diameter of tires: 17.0"
- Door pockets: Driver
- passenger and rear
- Door reinforcement: Side-impact door beam
- Driver Air Bag
- Driver Restriction Features
- Driver Vanity Mirror
- Driver airbag
- Dual vanity mirrors
- Dusk sensing headlights
- Electric power steering
- Engine immobilizer
- External temperature display
- Fixed antenna
- Fold forward seatback rear seats
- Forward Collision Mitigation : Pre-Collision Assist with Pedestrian Detection
- Four Wheel Drive
- Front Collision Mitigation
- Front Head Air Bag
- Front Head Room: 43.3"
- Front Hip Room: 55.9"
- Front Independent Suspension
- Front Leg Room: 43.1"
- Front Shoulder Room: 57.1"
- Front Side Air Bag
- Front Stabilizer Bar : Bar
- Front Ventilated disc brakes
- Front reading lights
- Front suspension stabilizer bar
- Fuel Capacity: 20.8 gal.
- Fuel Consumption: City: 20 mpg
- Fuel Consumption: Highway: 21 mpg
- Fuel Type: Regular unleaded
- Gasoline Fuel
- Gray aluminum rims
- Gross vehicle weight: 5
- 920 lbs.
- Headlights off auto delay
- Heated Mirrors
- Heated driver mirror
- Heated passenger mirror
- Immobilizer
- Independent front suspension classification
- Instrumentation: Low fuel level
- Intercooled Turbo
- Interior air filtration
- Intermittent Wipers
- Keyless Entry
- Keyless Start
- Keyless ignition with push button start
- LED Headlights
- LED Low/High Beam Reflector Headlights
- Leather Steering Wheel
- Leather/metal-look shift knob trim
- Leather/metal-look steering wheel trim
- Left rear passenger door type: Conventional
- Manual child safety locks
- Manual convertible roof
- Manual front air conditioning
- Max cargo capacity: 83 cu.ft.
- Mobile hotspot internet access
- Mp3 Capability
- Multi-link rear suspension
- Overall Length: 189.4"
- Overall Width: 75.9"
- Overall height: 73.0"
- Overhead console: Mini with storage
- Pass-Through Rear Seat
- Passenger Air Bag
- Passenger Air Bag Sensor
- Passenger Airbag
- Passenger Vanity Mirror
- Power Door Locks
- Power Mirror
- Power Steering
- Power remote driver mirror adjustment
- Power remote passenger mirror adjustment
- Power windows
- Privacy Glass
- Privacy glass: Deep
- Radio Data System
- Rear Bench Seat
- Rear Door Type : Swing-out
- Rear Head Air Bag
- Rear Head Room: 41.1"
- Rear Hip Room: 54.8"
- Rear Leg Room: 36.3"
- Rear Shoulder Room: 56.5"
- Rear View Camera
- Rear center seatbelt: 3-point belt
- Remote power door locks
- Requires Subscription
- Right rear passenger door type: Conventional
- Rigid axle rear suspension
- Rollover Protection Bars
- SYNC 4
- Satellite Radio
- Seatback storage: 2
- Seatbelt pretensioners: Front and rear
- Security System
- Short and long arm front suspension
- Side airbag
- SiriusXM Satellite Radio
- SiriusXM with 360L AM/FM/Satellite Radio
- SiriusXM with 360L Satellite Radio
- Smart Device Integration
- Spare Tire Mount Location: Outside rear
- Speed Sensitive Audio Volume Control
- Split rear bench
- Stability Control
- Stability controll with anti-roll
- Steering Wheel Audio Controls
- Suspension class: Off-road
- Sync 4 Applink/Apple CarPlay/Android Auto Wireless Mirroring
- Tachometer
- Telematics
- Tilt and telescopic steering wheel
- Tire Pressure Monitor
- Tire Pressure Monitoring System: Tire specific
- Tires - Front All-Terrain
- Tires - Rear All-Terrain
- Tires: Prefix: P
- Tires: Profile: 75
- Tires: Speed Rating: S
- Tires: Width: 255 mm
- Total Number of Speakers: 7
- Tow Hooks
- Traction Control
- Transmission hill holder
- Trip computer
- Turbocharged
- Two 12V DC power outlets
- Type of tires: AT
- Variable Speed Intermittent Wipers
- Variable intermittent front wipers
- Vehicle Emissions: LEV3-ULEV70
- Video Monitor Location: Front
- Wheel Diameter: 17
- Wheel Width: 7.5
- Wheelbase: 116.1"
- Wifi Hotspot
- Wireless Phone Connectivity : SYNC 4
Seller's Comments
We advertise the price that everyone qualifies for so please contact us as you may qualify for additional discounts. ATTENTION MISSOURI RESIDENTS NO , You DO NOT pay Illinois sales tax when you buy in Illinois. You only pay tax where you live.
View More3465 Progress Parkway
Granite City, Illinois 62040
(618) 452-5400
Looking for someone to work with?
View salespeople at this dealershipSimilar Vehicles
DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.

