Powered by Cars.com

2023 Hyundai Tucson

$27,995used

Contact Dealership

Basics

Condition

used

Interior Color

black

Exterior Color

portofino gray

Drivetrain

All-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

2.5L I4 16V PDI DOHC

VIN

5NMJECAE7PH285288

Stock Number

23591A

Mileage

21,600

Features

Entertainment

Premium Sound System

Exterior

Alloy Wheels

Sunroof/Moonroof

Safety

Brake Assist

Stability Control

Seating

Memory Seat

Heated Seats

Leather Seats

Convenience

Adaptive Cruise Control

HomeLink

Heated Steering Wheel

Navigation System

Power Liftgate

Remote Start

View Full List of Features

Seller's Comments

Take advantage of special pricing during our Certified Pre-Owned Inventory Clearance Event at Liberty Hyundai. This vehicle is Hyundai Certified Pre-Owned eligible and may be upgraded to Hyundai CPO status for added protection and benefits including a 10-Year/100,000-Mile Powertrain Limited Warranty, 150-Point Inspection, 24/7 Roadside Assistance, Rental Car Reimbursement, and complimentary CARFAX Vehicle History Report. Important: Advertised price reflects the vehicle in its current condition and does not include Hyundai Certified Pre-Owned certification, which is available for an additional cost. Price excludes taxes, registration, motor vehicle fees, certification cost (if selected), and $799 documentation fee. All vehicles subject to prior sale. See dealer for details. - Navigation System - Cargo Net - Roof Rack Cross Rails - First Aid Kit - All Season Fitted Liners This exceptional 2023 Hyundai Tucson Limited delivers a commanding presence on the road with its sleek Gray exterior and impressive 2.5L I4 engine that produces 187 horsepower. Equipped with All-Wheel Drive, this Tucson provides confident handling and traction in all weather conditions, ensuring a smooth and secure driving experience. Inside, the Tucson Limited pampers you with a wealth of premium features, including a Bose Premium audio system, heated and ventilated front seats, and a power liftgate for effortless cargo loading. The navigation system and Apple CarPlay/Android Auto integration keep you connected and on course, while the panoramic sunroof floods the cabin with natural light. Safety is also a top priority, with advanced features like Automatic Emergency Braking, Lane Keeping Assist, and Blind Spot Monitoring providing an extra layer of protection for you and your loved ones. With an impressive EPA-estimated 23 MPG in the city and 28 MPG on the highway, this Tucson Limited delivers exceptional efficiency to complement its dynamic performance. We're confident you'll be impressed by the exceptional value and quality of this 2023 Hyundai Tucson Limited. Experience the difference for yourself by scheduling a test drive at Liberty Hyundai today. We look forward to helping you find the perfect vehicle to meet your needs and exceed your expectations.

Contact Liberty Hyundai

Call (201) 529-2400

Liberty Hyundai
4.5 |
1,130 Lifetime Reviews

305 New Jersey 17

Mahwah, New Jersey 07430

(201) 529-2400

Similar Vehicles

new 2026 Hyundai Tucson car, priced at $32,155
2026 Hyundai Tucson
new
Red exterior
Automatic
All-wheel Drive
new 2026 Hyundai Tucson car, priced at $31,880
2026 Hyundai Tucson
new
Atlantic Blue exterior
Automatic
All-wheel Drive
new 2026 Hyundai Tucson car, priced at $34,605
2026 Hyundai Tucson
new
Phantom Black exterior
Automatic
All-wheel Drive
new 2026 Hyundai Tucson car, priced at $32,090
2026 Hyundai Tucson
new
White Pearl exterior
Automatic
All-wheel Drive
new 2026 Hyundai Tucson car, priced at $35,105
2026 Hyundai Tucson
new
Red exterior
Automatic
All-wheel Drive
new 2026 Hyundai Tucson car, priced at $34,655
2026 Hyundai Tucson
new
Gray exterior
Automatic
All-wheel Drive
new 2026 Hyundai Tucson car, priced at $31,655
2026 Hyundai Tucson
new
Phantom Black exterior
Automatic
All-wheel Drive

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.