Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Mileage
Features
Exterior
Alloy Wheels
Convenience
Keyless Start
Navigation System
Remote Start
USB Port
Safety
Automatic Emergency Braking
Backup Camera
Blind Spot Monitor
Brake Assist
Stability Control
Lane Departure Warning
Rear Cross Traffic Alert
Features
- 1.3L I4 Turbo MAIR DI with Engine Stop/start
- 12V power outlets 2 12V power outlets
- 17in x 7.0in Aluminum Wheels
- 3-point seatbelt Rear seat center 3-point seatbelt
- 3.734 Final Drive Ratio
- 4-Wheel Disc Brakes
- 4WD type Jeep Active Drive automatic full-time 4WD
- 6 Speakers
- ABS Brakes 4-wheel antilock (ABS) brakes
- ABS Brakes Four channel ABS brakes
- ABS brakes
- AM/FM radio: SiriusXM
- Accessory power Retained accessory power
- Air Conditioning
- Air conditioning Yes
- All-in-one key All-in-one remote fob and ignition key
- Alloy wheels
- Alternator Type Alternator
- Altitude Package
- Ambient lighting
- Android Auto
- Antenna Integrated roof audio antenna
- Anti-whiplash front head restraints
- Apple CarPlay
- Apple CarPlay/Android Auto
- Armrests front center Sliding front seat center armrest
- Auto door locks Auto-locking doors
- Auto headlights Auto on/off headlight control
- Automatic Emergency Braking
- Automatic temperature control
- Aux input jack Auxiliary input jack
- Backup Camera
- Basic warranty 36 month/36
- 000 miles
- Battery charge warning
- Battery run down protection
- Battery type Lead acid battery
- Beverage holders Front beverage holders
- Beverage holders rear Rear beverage holders
- Black Accent Stitching
- Black Headliner
- Blind Spot Monitor
- Blind spot Blind Spot Detection
- Body panels Fully galvanized steel body panels with side impact beams
- Bodyside cladding Black bodyside cladding
- Brake Assist
- Brake assist
- Brake assist system
- Brake type 4-wheel disc brakes
- Bulb warning Bulb failure warning
- Bumpers front Black front bumper
- Bumpers rear Black rear bumper
- Cabin air filter
- Capless fuel filler
- Cargo floor type Carpet cargo area floor
- Cargo light Cargo area light
- Cargo tie downs Cargo area tie downs
- Child door locks Manual rear child safety door locks
- Climate control Automatic climate control
- Clock Digital clock
- Compass
- Compressor Intercooled turbo
- Configurable instrumentation gauges
- Console insert material Colored console insert
- Corrosion perforation warranty 60 month/unlimited
- Cruise control Cruise control with steering wheel mounted controls
- Cylinder head material Aluminum cylinder head
- Day/Night rearview mirror
- Delay off headlights Delay-off headlights
- Delay-off headlights
- Deluxe Cloth High-Back Bucket Seats
- Door ajar warning Rear cargo area ajar warning
- Door bins front Driver and passenger door bins
- Door bins rear Rear door bins
- Door handle material Body-colored door handles
- Door locks Power door locks with 2 stage unlocking
- Door mirror style Black door mirrors
- Door mirror type Standard style side mirrors
- Door mirrors Power door mirrors
- Door panel insert Colored door panel insert
- Door trim insert Vinyl door trim insert
- Drive type Four-wheel drive
- Driver door bin
- Driver foot rest
- Driver information center
- Driver seat direction Driver seat with 6-way directional controls
- Driver selectable steering effort
- Driver vanity mirror
- Drivetrain selectable Selec-Terrain driver selectable drivetrain mode
- Dual Climate Control
- Dual front impact airbags
- Dual front side impact airbags
- Dual-zone front climate control
- Electronic Stability Control
- Electronic parking brake
- Electronic stability control Electronic stability control system with anti-roll
- Emergency SOS Capable SiriusXM Guardian vehicle integrated emergency SOS system
- Emergency communication system: SiriusXM Guardian
- Emissions LEV3-ULEV50 emissions
- Emissions tiers Tier 3 Bin 50 emissions
- Engine 1.3L I-4 gasoline direct injection
- Multiair variable valve control
- intercooled turbo
- premium unleaded
- engine with 177HP
- Engine Cylinders I4
- Engine Location Front mounted engine
- Engine Mounting direction Transverse mounted engine
- Engine block material Aluminum engine block
- Engine temperature warning
- Engine/electric motor temperature gauge
- External memory External memory control
- First-row windows Power first-row windows
- Floor console Full floor console
- Floor console storage Covered floor console storage
- Floor coverage Full floor coverage
- Floor covering Full carpet floor covering
- Floor mats Rubber front and rear floor mats
- Fob engine controls Keyless Enter 'n Go with hands-free access and push button start
- Fog lights Front fog lights
- Fold flat front passenger seat
- Folding door mirrors Manual folding door mirrors
- Folding rear seats 60-40 folding rear seats
- Forward collision warning Full Speed Forward Collision Warning Plus
- Four Wheel Drive
- Four wheel independent suspension
- Front Bucket Seats
- Front Center Armrest
- Front anti-roll Front anti-roll bar
- Front anti-roll bar
- Front anti-whiplash head restraints Anti-whiplash front seat head restraints
- Front beverage holders
- Front cornering lights
- Front dual zone A/C
- Front fog lights
- Front head restraint control Manual front seat head restraint control
- Front head restraints Height adjustable front seat head restraints
- Front impact airbag driver Driver front impact airbag
- Front impact airbag passenger Passenger front impact airbag
- Front reading lights
- Front seat upholstery Premium cloth front seat upholstery
- Front seatback upholstery Cloth front seatback upholstery
- Front side impact airbag driver Seat mounted side impact driver airbag
- Front side impact airbag passenger Seat mounted side impact front passenger airbag
- Fuel Type Premium Unleaded
- Fuel door Power fuel door release
- Fully automatic headlights
- Gauge cluster display size (inches) Gauge cluster display size: 7.00
- Gearshifter material Leatherette gear shifter material
- Gloss Black Exterior Accents
- Gloss Black Steering Wheel Bezel
- Glove box Illuminated locking glove box
- Grille style Black grille with chrome accents
- Handsfree Uconnect w/Bluetooth handsfree wireless device connectivity
- Headlight type Reflector headlights
- Headlights Halogen headlights
- Headlights on reminder
- Headliner coverage Full headliner coverage
- Headliner material Cloth headliner material
- Heated door mirrors
- Heated door mirrors Heated driver and passenger side door mirrors
- Height adjustable seatbelts Front height adjustable seatbelts
- High mount stop light High mounted center stop light
- Hill start assist
- Ignition Spark ignition system
- Illuminated entry
- Illuminated glove box
- Immobilizer Sentry Key immobilizer
- Instrumentation display Digital/analog instrumentation display
- Integrated navigation Integrated navigation system with voice activation
- Interior accents Metal-look interior accents
- Interior courtesy lights Fade interior courtesy lights
- Internet access SiriusXM Guardian mobile hotspot internet access
- Internet radio capability
- Key in vehicle warning
- Keyfob keyless entry
- Keyfob remote start
- Keyless Entry
- Keyless Start
- Knee airbag
- Knee airbag Driver side knee airbag
- Lane Departure Warning
- Lane departure Lane Departure Warning-Plus
- License plate front bracket Front license plate bracket
- Lock-up transmission
- Locking hub control Permanent locking hub control
- Low level warnings Low level warning for coolant
- fuel
- washer fluid and brake fluid
- Low tire pressure warning
- Low tire pressure warning Tire specific low air pressure warning
- Maintenance warranty 36 month/unlimited
- Manual driver seat controls Driver seat manual reclining
- fore/aft control and height adjustable control
- Manual passenger seat controls Passenger seat manual reclining and fore/aft control
- Mobile app access
- Multi-level cargo floor
- Navigation System
- Normal Duty Suspension
- Number of airbags 7 airbags
- Number of beverage holders 8 beverage holders
- Number of doors 4 doors
- Number of first-row screens 2 total number of 1st row displays
- Occupancy sensor Airbag occupancy sensor
- Occupant sensing airbag
- Oil pressure warning
- Oil temperature gauge
- One-touch down window Driver and passenger one-touch down windows
- One-touch up window Driver and passenger one-touch up windows
- Outside temperature display
- Overdrive transmission
- Overhead airbag
- Overhead airbags Curtain first and second-row overhead airbags
- Paint Non-metallic paint
- Panel insert Colored instrument panel insert
- Panic alarm
- ParkView Rear Back-Up Camera
- Passenger door bin
- Passenger doors rear left Conventional left rear passenger door
- Passenger doors rear right Conventional right rear passenger door
- Passenger seat direction Front passenger seat with 4-way directional controls
- Passenger vanity mirror
- Perimeter approach lighting Remote activated perimeter approach lighting
- Power door mirrors
- Power steering
- Power windows
- Powertrain type ICE
- Powertrain warranty 60 month/60
- 000 miles
- Premium Cloth Bucket Seats
- Primary display size 8.4 inch primary display
- Primary display touchscreen Primary monitor touchscreen
- Quick Order Package 22M Altitude
- RDS Radio data system (RDS)
- Radiator
- Radio AM/FM/digital/SiriusXMsatellite
- Radio data system
- Radio: Uconnect 4C Nav w/8.4in Display
- Real time traffic SiriusXM Traffic Plus real-time traffic
- Real time weather SiriusXM Travel Link real-time weather
- Rear Cross Traffic Alert
- Rear Spoiler
- Rear Springs Regular grade rear springs
- Rear anti-roll Rear anti-roll bar
- Rear anti-roll bar
- Rear camera ParkView rear mounted camera
- Rear cargo door Liftgate rear cargo door
- Rear collision warning Cross Path Detection collision warning
- Rear head restraint control 3 rear seat head restraints
- Rear head restraint control Manual rear seat head restraint control
- Rear head restraints Height adjustable rear seat head restraints
- Rear seat direction Front facing rear seat
- Rear seat folding position Fold forward rear seatback
- Rear seat upholstery Premium cloth rear seat upholstery
- Rear seatback upholstery Carpet rear seatback upholstery
- Rear seats Rear bench seat
- Rear seats fixed or removable Fixed rear seats
- Rear under seat ducts Rear under seat climate control ducts
- Rear window defroster
- Rear window wiper
- Rear windshield Fixed rear windshield
- Rear windshield wipers
- Remote keyless entry
- Remote panic alarm
- Roadside warranty 60 month/60
- 000 miles
- Roof Rack
- Roof rack: rails only
- Roof rails
- Running lights Daytime running lights
- Satellite trial 6 month satellite trial subscription
- Seatback storage pockets 1 seatback storage pocket
- Seatbelt pretensioners Front seatbelt pretensioners
- Seatbelt pretensioners number 2 seatbelt pre-tensioners
- Seating capacity 5
- Second-row windows Power second-row windows
- Security system
- Seek scan
- Selectable mode transmission
- Sequential shift control
- Service interval warning Service interval indicator
- Shifter boot Leatherette shifter boot
- Shock absorbers Gas-pressurized shock absorbers
- Shutters Active grille shutters
- Smart device integration Apple CarPlay/Android Auto smart device mirroring
- Smart device remote start
- Speakers Standard grade speakers
- Speakers number 6 speakers
- Special paint Monotone paint
- Speed control
- Speed sensitive volume
- Speedometer Redundant digital speedometer
- Split folding rear seat
- Split front seats Bucket front seats
- Spoiler
- Spoiler Rear lip spoiler
- Springs front Front coil springs
- Springs rear Rear coil springs
- Stability Control
- Start-stop engine Auto stop-start engine
- Steering Electric power-assist steering system
- Steering mounted audio control Steering wheel mounted audio controls
- Steering type Rack-pinion steering
- Steering wheel material Leatherette steering wheel
- Steering wheel mounted audio controls
- Steering wheel telescopic Manual telescopic steering wheel
- Steering wheel tilt Manual tilting steering wheel
- Supplemental cabin heater
- Suspension Standard ride suspension
- Suspension control Automatic suspension ride control with driver control
- Suspension ride type front Independent front suspension
- Suspension ride type rear Independent rear suspension
- Suspension type front Strut front suspension
- Suspension type rear Multi-link rear suspension
- Tachometer
- Tailgate control Tailgate/power door lock
- Tailpipe Stainless steel single exhaust
- Telescoping steering wheel
- Temperature display Exterior temperature display
- Third-row windows Fixed third-row windows
- Tilt steering wheel
- Tinted windows Deep tinted windows
- Tire mobility kit
- Tires P225/55TR18 AS BSW front and rear tires
- Towing trailer sway Trailer sway control
- Traction Control
- Traction control
- Traction control Selec-Terrain all-speed ABS and driveline traction control
- Transfer case Electronic transfer case shift
- Transmission TorqueFlite 9-speed automatic
- Transmission Type Automatic
- Transmission electronic control
- Transmission fluid temperature warning Transmission fluid temp warning
- Transmission temperature gauge Transmission fluid temperature gauge
- Trip computer
- Trip odometer
- Trunk lid trim Plastic trunk lid trim
- Turbocharged
- Turn signal warning Turn signal on warning
- USB Port
- USB ports 2 USB ports
- Variable panel light Variable instrument panel light
- Variably intermittent wipers
- Vehicle tracker SiriusXM Guardian vehicle tracker
- Ventilated brakes Front ventilated disc brakes
- Visor driver expandable coverage Driver visor with expandable coverage
- Visor driver mirror Driver visor mirror
- Visor illuminated driver mirror Illuminated driver visor mirror
- Visor illuminated passenger mirror Illuminated passenger visor mirror
- Visor passenger expandable coverage Passenger visor with expandable coverage
- Visor passenger mirror Passenger visor mirror
- Voice activated audio Voice activated audio controls
- Voltmeter
- WIFI Hotspot
- Wheel well trim Black wheel well trim
- Wheels 18 x 8-inch front and rear black aluminum wheels
- Wheels: 18in x 8.0in Gloss Black
- Window Trim Black side window trim
- Wipers Variable intermittent front windshield wipers
- Wireless streaming Bluetooth wireless audio streaming
Seller's Comments
At Key Chrysler Dodge Jeep Ram of Rochester you win! Call us today at (603) 332-2010We make the car buying process very simple by displaying the lowest price on the window. We price our vehicles more aggressively than anyone else in the area. For that reason, we're proud to display it on every vehicle's window.We believe there is more to buying a vehicle than worrying about the price. For that reason, Key Auto has simplified that process for our customers. When we price a vehicle, we take the following into consideration: 1) market conditions, 2) what the area dealers are selling them for, 3) Kelly Blue Book* retail. This way, when you leave a Key Auto Dealership, you're confident you've received the absolute best deal.CARFAX One-Owner.2022 Jeep Renegade Altitude Sting-Gray Clearcoat 4D Sport Utility Altitude 1.3L I4 9-Speed 948TE Automatic 4WDKey Chrysler Dodge Jeep Ram of Rochester is proud to present you with another True Market Priced Pre-Owned Vehicle. Transparent Pricing Of $ 18275 !! This 2022 Jeep Renegade Altitude is loaded with the following Factory Options: Altitude Package, Quick Order Package 22M Altitude (Black Accent Stitching, Black Headliner, Deluxe Cloth High-Back Bucket Seats, Gloss Black Exterior Accents, Gloss Black Steering Wheel Bezel, and Wheels: 18'' x 8.0'' Gloss Black), 17'' x 7.0'' Aluminum Wheels, 3.734 Final Drive Ratio, 4-Wheel Disc Brakes, 6 Speakers, ABS brakes, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM, Anti-whiplash front head restraints, Apple CarPlay/Android Auto, Automatic temperature control, Brake assist, Compass, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: SiriusXM Guardian, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front fog lights, Front reading lights, Fully automatic headlights, Heated door mirrors, Illuminated entry, Knee airbag, Low tire pressure warning, Navigation System, Normal Duty Suspension, Occupant sensing airbag, Outside temperature display, Overhead airbag, Panic alarm, ParkView Rear Back-Up Camera, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power steering, Power windows, Premium Cloth Bucket Seats, Radio data system, Radio: Uconnect 4C Nav w/8.4'' Display, Rear anti-roll bar, Rear window defroster, Rear window wiper, Remote keyless entry, Roof rack: rails only, Security system, Speed control, Split folding rear seat, Spoiler, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Variably intermittent wipers, and Voltmeter!!
View More401 North Main St
Rochester, New Hampshire 03867
(603) 332-2010
Looking for someone to work with?
View salespeople at this dealershipSimilar Vehicles
DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.

