Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Mileage
Features
Exterior
Alloy Wheels
Sunroof/Moonroof
LED Headlights
Seating
Leather Seats
Heated Seats
Memory Seat
Convenience
Adaptive Cruise Control
Keyless Start
Heated Steering Wheel
Navigation System
Power Liftgate
USB Port
Safety
Backup Camera
Automatic Emergency Braking
Blind Spot Monitor
Brake Assist
Stability Control
Lane Departure Warning
Rear Cross Traffic Alert
Features
- 10 Speakers
- 12V power outlets 2 12V power outlets
- 3-point seatbelt Rear seat center 3-point seatbelt
- 360 Degree Camera
- 4-Wheel Disc Brakes
- 4WD type Automatic full-time AWD
- ABS Brakes 4-wheel antilock (ABS) brakes
- ABS Brakes Four channel ABS brakes
- ABS brakes
- ACTIVE PARK ASSIST - PREP KIT
- AM/FM Stereo
- AM/FM radio: SiriusXM with 360L
- Accessory power Retained accessory power
- Active Park Assist 2.0
- Active Park Assist Prep Kit
- Adaptive Cruise Control
- Adaptive cruise control Adaptive Cruise Control with Stop-and-Go
- Air Conditioning
- Air conditioning Yes
- All Wheel Drive
- All-in-one key All-in-one remote fob and ignition key
- Alloy wheels
- Ambient lighting
- Amplifier
- Android Auto
- Antenna Fixed audio antenna
- Apple CarPlay
- Apple CarPlay/Android Auto
- Armrests front center Front seat center armrest
- Armrests rear Rear seat center armrest
- Auto High-beam Headlights
- Auto door locks Auto-locking doors
- Auto headlights Autolamp auto on/off headlight control
- Auto high-beam headlights
- Auto-dimming Rear-View mirror
- Automatic Emergency Braking
- Automatic brake hold
- Automatic curve slowdown cruise control
- Automatic temperature control
- Automatic vehicle parking Ford Co-Pilot360 - Active Park Assist 2.0 automatic vehicle parking
- Autonomous cruise control Ford Co-Pilot360 Assist 2.0 - Lane Centering hands-off cruise control
- Axle Ratio: 9.05
- BLACK ACTIVEX/COPPER STITCH
- Backup Camera
- Basic warranty 36 month/36
- 000 miles
- Battery charge warning
- Battery run down protection
- Battery type Lead acid battery
- Beverage holders Front beverage holders
- Beverage holders rear Rear beverage holders
- Blind Spot Monitor
- Blind spot Ford Co-Pilot360 - BLIS (Blind Spot Information System)
- BlueCruise Hands-Free Driving
- Body panels Composite/galvanized steel body panels with side impact beams
- Bodyside cladding Black bodyside cladding
- Brake Assist
- Brake assist
- Brake assist system
- Brake type 4-wheel disc brakes
- Built-in virtual assistant SYNC 4A with Enhanced Voice Recognition (Alexa-Built-In) built-in virtual assistant
- Bumper insert Black front bumper insert
- Bumper rub strip rear Black rear bumper rub strip
- Bumpers front Body-colored front bumper
- Bumpers rear Body-colored rear bumper
- Bumpers: body-color
- Cabin air filter
- Camera 360 Degree Camera aerial view camera
- Cargo Area Protector
- Cargo access Power cargo area access release
- Cargo cover Folding cargo cover
- Cargo floor type Carpet cargo area floor
- Cargo light Cargo area light
- Cargo mats Vinyl/rubber cargo mat
- Cargo tie downs Cargo area tie downs
- Cell traction battery 376
- Charge port door activation Manual charge port door activation
- Child door locks Power rear child safety door locks
- Climate control Automatic climate control
- Clock Digital clock
- Compass
- Concealed cargo storage Cargo area concealed storage
- Configurable instrumentation gauges
- Corrosion perforation warranty 60 month/unlimited
- Cruise control Cruise control with steering wheel mounted controls
- DC fast charge (peak rate) 45.000 minutes
- DC fast charge connector type SAE CCS DC fast charge connector
- DRL preference setting
- Day/Night rearview mirror
- Delay off headlights Delay-off headlights
- Delay-off headlights
- Digital signal processor
- Door ajar warning Rear cargo area ajar warning
- Door bins front Driver and passenger door bins
- Door bins rear Rear door bins
- Door handle material Black door handles
- Door locks Power door locks with 2 stage unlocking
- Door mirror style Black door mirrors
- Door mirror type Standard style side mirrors
- Door mirrors Power door mirrors
- Door trim insert Leatherette door trim insert
- Drive type All-wheel drive
- Driver attention monitor Driver Alert
- Driver door bin
- Driver foot rest
- Driver information center
- Driver lumbar Driver seat with 2-way power lumbar
- Driver seat direction Driver seat with 6-way directional controls
- Driver selectable regen levels
- Driver selectable steering effort
- Driver vanity mirror
- Drivetrain selectable Driver selectable drivetrain mode
- Dual Climate Control
- Dual front impact airbags
- Dual front side impact airbags
- Dual-zone front climate control
- Eco Feedback ECO feedback display gauge
- Electric power regeneration gauge Electric power/regeneration gauge
- Electric powertrain BEV (battery electric vehicle)
- Electronic Stability Control
- Electronic parking brake
- Electronic stability control AdvanceTrac electronic stability control system
- Emergency SOS Capable 911 Assist emergency SOS system via mobile device
- Emergency communication system: 911 Assist
- Emissions ZEV emissions
- Emissions tiers Tier 3 Bin 0 emissions
- Engine Location Front and rear mounted engine
- Engine Mounting direction Transverse mounted engine
- Equipment Group 400A
- Evasion assist system Evasive Steering Assist evasion assist system
- Exterior Parking Camera Rear
- External acoustic pedestrian alert
- External door locks SecuriCode external keypad door lock control
- External memory SYNC 4 external memory control
- FORD CO-PILOT360 ACTIVE 2.0
- FRONT LICENSE PLATE BRACKET
- First-row sunroof First and second-row fixed glass sunroof
- First-row windows Power first-row windows
- Floor console Full floor console
- Floor console storage Covered floor console storage
- Floor coverage Full floor coverage
- Floor covering Full carpet floor covering
- Floor mats Rubber front and rear floor mats
- Fob engine controls Smart key with hands-free access and push button start
- Folding door mirrors Power folding door mirrors
- Folding rear seats 60-40 folding rear seats
- Ford Co-Pilot360 Active 2.0
- Forward collision warning Ford Co-Pilot360 - Pre-Collision Assist with (AEB) and Intersection Assist forward collision mitigation with left turn assist
- Four wheel independent suspension
- Front & Rear Floor Liners
- Front Bucket Seats
- Front Center Armrest
- Front License Plate Bracket
- Front anti-roll Front anti-roll bar
- Front anti-roll bar
- Front camera Front mounted camera with washer
- Front dual zone A/C
- Front head restraint control Manual front seat head restraint control
- Front head restraints Height and tilt adjustable front seat head restraints
- Front impact airbag driver Driver front impact airbag
- Front impact airbag passenger Passenger front impact airbag
- Front left charge port door
- Front passenger lumbar Front passenger seat with 2-way power lumbar
- Front reading lights
- Front seat type Sport front bucket seats
- Front seat upholstery ActiveX/Miko simulated suede and leatherette front seat upholstery
- Front seatback upholstery Leatherette front seatback upholstery
- Front side impact airbag driver Seat mounted side impact driver airbag
- Front side impact airbag passenger Seat mounted side impact front passenger airbag
- Front trunk Manual front trunk
- Front windshield solar coating
- Fuel Type Electric
- Full gauge cluster screen
- Fully automatic headlights
- Garage door opener
- Garage door transmitter
- Gauge cluster display size (inches) Gauge cluster display size: 10.20
- Glove box Illuminated glove box
- Grille style Black grille
- Handsfree SYNC 4 handsfree wireless device connectivity
- Headlight type Projector beam headlights
- Headlights LED low and high beam headlights
- Headlights on reminder
- Headliner coverage Full headliner coverage
- Headliner material Cloth headliner material
- Heated ActiveX Sport Seats
- Heated Seats
- Heated Steering Wheel
- Heated door mirrors
- Heated door mirrors Heated driver and passenger side door mirrors
- Heated front seats
- Heated front seats Heated driver and front passenger seats
- Heated steering wheel
- Heated wipers Heated windshield wiper park
- Height adjustable seatbelts Front height adjustable seatbelts
- High mount stop light High mounted center stop light
- High voltage electrical system 96 month/100000 miles
- Hill start assist
- ICED BLUE METALLIC
- INTERIOR PROTECTION PACKAGE
- Illuminated entry
- Illuminated glove box
- Illuminated ignition switch
- Immobilizer SecuriLock immobilizer
- Instrumentation display Digital instrumentation display
- Integrated navigation Connected Navigation integrated navigation system with voice activation
- Interior Protection Package (Pre-Installed)
- Interior accents Chrome and aluminum interior accents
- Interior courtesy lights Fade interior courtesy lights
- Internet access FordPass Connect mobile hotspot internet access
- Key in vehicle warning
- Keyfob cargo controls Keyfob trunk control
- Keyfob keyless entry
- Keyfob window controls Keyfob window control
- Keyless Entry
- Keyless Start
- Knee airbag
- Knee airbag Driver side knee airbag
- LED brake lights
- Lane Departure Warning
- Lane departure Lane Keeping Alert
- Left camera Left side camera
- License plate front bracket Front license plate bracket
- Lighted badging
- Locking hub control Permanent locking hub control
- Low level warnings Low level warning for brake fluid
- Low tire pressure warning
- Low tire pressure warning Tire specific low air pressure warning
- Memory Seat
- Memory seat
- Memory settings Memory settings include: door mirrors
- Mobile app access FordPass App mobile app access
- Multi-level cargo floor
- Multiple headlights Multiple enclosed headlights
- Navigation System
- Navigation system: Connected Navigation
- Number of airbags 9 airbags
- Number of beverage holders 6 beverage holders
- Number of doors 4 doors
- Number of first-row screens 2 total number of 1st row displays
- Number of memory settings 3 memory settings
- Occupancy sensor Airbag occupancy sensor
- Occupant sensing airbag
- One-touch down window Front and rear one-touch down windows
- One-touch up window Front and rear one-touch up windows
- Outside temperature display
- Over the air updates
- Overhead airbag
- Overhead airbags Curtain first and second-row overhead airbags
- Overhead console
- Overhead console Mini overhead console
- Overhead console storage
- PANORAMIC FIXED-GLASS ROOF
- Paint Metallic paint
- Painted calipers Red painted front and rear brake calipers
- Panel insert Aluminum instrument panel insert
- Panic alarm
- Panoramic Fixed-Glass Roof
- Parking sensors Ford Co-Pilot360 - Active Park Assist 2.0 front and rear parking sensors
- Passenger door bin
- Passenger doors rear left Conventional left rear passenger door
- Passenger doors rear right Conventional right rear passenger door
- Passenger seat direction Front passenger seat with 6-way directional controls
- Passenger vanity mirror
- Peak DC fast charge rate (kW) 150.000 kW
- Pedestrian detection Ford Co-Pilot360 - Pre-Collision Assist with Pedestrian Detection
- Perimeter approach lighting Remote activated perimeter approach lighting
- Plug and charge
- Post collision braking system Automatic post-collision braking system
- Power Driver Seat
- Power Liftgate
- Power door mirrors
- Power driver seat
- Power driver seat controls Driver seat power reclining
- lumbar support
- fore/aft control and height adjustable control
- Power passenger seat
- Power passenger seat controls Passenger seat power reclining
- lumbar support
- fore/aft control and height adjustable control
- Power steering
- Power windows
- Powertrain type EV
- Powertrain warranty 60 month/60
- 000 miles
- Preconditioning Remote-activated interior climate preconditioning
- Primary display size 15.5 inch primary display
- Primary display touchscreen Primary monitor touchscreen
- RDS Radio data system (RDS)
- Radiator
- Radio AM/FM/SiriusXM with 360Lsatellite
- Radio data system
- Rain Sensing Front Wipers
- Rain detecting wipers
- Rain sensing wipers
- Real time traffic Real-time traffic
- Rear Cross Traffic Alert
- Rear Spoiler
- Rear Springs Regular grade rear springs
- Rear anti-roll Rear anti-roll bar
- Rear anti-roll bar
- Rear camera Rear mounted camera
- Rear cargo door Power liftgate rear cargo door
- Rear collision warning Ford Co-Pilot360 - Reverse Brake Assist collision mitigation
- Rear console climate control ducts
- Rear head restraint control 3 rear seat head restraints
- Rear head restraints Fixed rear head restraints
- Rear seat center armrest
- Rear seat direction Front facing rear seat
- Rear seat folding position Fold forward rear seatback
- Rear seat upholstery ActiveX/Miko simulated suede and leatherette rear seat upholstery
- Rear seatback upholstery Carpet rear seatback upholstery
- Rear seats Rear bench seat
- Rear seats fixed or removable Fixed rear seats
- Rear side impact airbag
- Rear side impact airbag Rear side impact airbags
- Rear under seat ducts Rear under seat climate control ducts
- Rear window defroster
- Rear window trim Black rear window trim
- Rear window wiper
- Rear windshield Fixed rear windshield
- Rear windshield wipers
- Rearview mirror Auto-dimming rear view mirror
- Regenerative brakes One-pedal regenerative brakes
- Remote keyless entry
- Remote panic alarm
- Restricted driving mode/alerts MyKey restricted driving mode/alerts
- Right camera Right side camera
- Roadside warranty 60 month/60
- 000 miles
- Running lights LED daytime running lights
- SAE Autonomy Level 2 - partial automation SAE Autonomy
- SYNC 4A w/Enhanced Voice Recognition
- SYNC 4A with Enhanced Voice Recognition
- Satellite trial 3 month satellite trial subscription
- Seatback storage pockets 2 seatback storage pockets
- Seatbelt pretensioners Front seatbelt pretensioners
- Seatbelt pretensioners number 2 seatbelt pre-tensioners
- Seating capacity 5
- Second-row windows Power second-row windows
- Security system
- Seek scan
- Selectable mode transmission
- Service interval warning Service interval indicator
- Shock absorbers Gas-pressurized shock absorbers
- Shutters Active grille shutters
- SiriusXM Radio w/360L
- SiriusXM Radio with 360L
- Smart device integration Apple CarPlay/Android Auto smart device wireless mirroring
- Smart device-as-key proximity door locks
- Speakers B&O speakers
- Speakers number 10 speakers
- Special paint Roof accent two-tone paint scheme
- Speed control
- Speed sensitive steering Speed sensitive power steering
- Speed sensitive volume
- Speed sensitive wipers
- Speed-Sensitive Wipers
- Speed-sensing steering
- Speedometer Redundant digital speedometer
- Split folding rear seat
- Split front seats Bucket front seats
- Spoiler
- Spoiler Rear lip spoiler
- Sport pedals Sport style pedals
- Springs front Front coil springs
- Springs rear Rear coil springs
- Stability Control
- Steering Electric power-assist steering system
- Steering mounted audio control Steering wheel mounted audio controls
- Steering type Rack-pinion steering
- Steering wheel material Leatherette steering wheel
- Steering wheel mounted audio controls
- Steering wheel telescopic Manual telescopic steering wheel
- Steering wheel tilt Manual tilting steering wheel
- Sunroof/Moonroof
- Suspension Standard ride suspension
- Suspension ride type front Independent front suspension
- Suspension ride type rear Independent rear suspension
- Suspension type front Strut front suspension
- Suspension type rear Multi-link rear suspension
- Tailgate control Tailgate/power door lock
- Telescoping steering wheel
- Temperature display Exterior temperature display
- Third-row windows Fixed third-row windows
- Tilt steering wheel
- Tinted windows Deep tinted windows
- Tire mobility kit
- Tires P245/45WR20 AS BSW front and rear tires
- Traction Control
- Traction battery level gauge
- Traction battery type Lithium ion (Li-ion)
- Traction battery warranty 96 month/100000 miles
- Traction control
- Traction control All-speed ABS and driveline traction control
- Traffic sign information Ford Co-Pilot360 - Speed Sign Recognition with automatic speed limit assist
- Transmission 1-speed automatic
- Transmission Automatic
- Transmission Type Automatic
- Transmission oil cooler
- Trip computer
- Trip odometer
- Trunk hatch Trunk/hatch auto-latching
- Trunk lid trim Plastic trunk lid trim
- Turn signal in door mirrors Turn signal indicator in door mirrors
- Turn signal indicator mirrors
- USB Port
- USB ports 4 USB ports
- Unresponsive driver assist
- V traction battery 404
- Valet key
- Variable panel light Variable instrument panel light
- Variably intermittent wipers
- Vehicle tracker
- Ventilated brakes Front ventilated disc brakes
- Visor driver expandable coverage Driver visor with expandable coverage
- Visor driver mirror Driver visor mirror
- Visor illuminated driver mirror Illuminated driver visor mirror
- Visor illuminated passenger mirror Illuminated passenger visor mirror
- Visor passenger expandable coverage Passenger visor with expandable coverage
- Visor passenger mirror Passenger visor mirror
- Voice activated audio SYNC 4A with Enhanced Voice Recognition (Alexa-Built-In) voice activated audio controls
- Voice activated climate control SYNC 4A with Enhanced Voice Recognition (Alexa-Built-In) voice-activated climate control
- WIFI Hotspot
- Wheel well trim Body-colored wheel well trim
- Wheels 20 x 8-inch front and rear machined w/painted accents aluminum wheels
- Wheels: 20in Machined-Face Aluminum
- Window Trim Black side window trim
- Wipers Variable intermittent front windshield wipers
- Wireless device charging Front wireless smart device charging
- Wireless streaming Bluetooth wireless audio streaming
Seller's Comments
The 2024 Jeep Wrangler 2-Door Willys 4x4 is an impressive vehicle that masterfully blends rugged capability with modern technological advancements, making it a perfect choice for both adventure enthusiasts and those navigating daily commutes. At its heart, the Wrangler is powered by the robust Pentastar 3.6L V-6 engine, delivering a thrilling 285 horsepower, complemented by a 6-speed manual transmission that ensures an exhilarating driving experience, regardless of the terrain.
One of the standout features of the 2024 Wrangler Willys is its **wireless connectivity**. This feature allows you to make hands-free calls and access necessary apps without diverting your focus from the road. It promotes safety and convenience, enhancing the overall driving experience and allowing you to stay connected with ease.
The Wrangler Willys prioritizes comfort with its **6-way driver seat**. Regardless of the journeys length, this adjustable seat enables you to find your ideal driving position, ensuring each trip is as comfortable as possible. Comfort is not just a luxury; its essential for enjoyable adventures.
In todays digital age, efficient charging options are crucial, and the Wrangler excels here with **3 USB ports**. This feature allows passengers to charge their devices while enjoying their favorite tunes, eliminating the hassle of misplaced adapters. Stay charged and entertained on all your travels.
Safety is also a fundamental aspect of the 2024 Jeep Wrangler Willys. Featuring a cutting-edge **forward collision mitigation** system, this advanced technology continuously scans the road ahead, preparing the vehicle to respond to potential collisions. It provides peace of mind for both the driver and passengers.
For those who require constant connectivity, the **mobile hotspot** feature transforms your Jeep into a personal WiFi hub. This allows you and your passengers to stay connected without using up your mobile data, making it an excellent option for families on long trips.
Additionally, the **rear camera** significantly enhances visibility, helping you navigate tight spaces and avoid obstacles while reversing. Coupled with **predictive brake assist**, which prepares the brakes for maximum stopping power when necessary, the Wrangler ensures optimal safety and control in every driving situation.
In summary, the 2024 Jeep Wrangler 2-Door Willys 4x4 is more than just a vehicle; it is a versatile adventure companion equipped with advanced technology and robust safety features. Whether you are tackling rugged trails or cruising through city streets, the Wrangler is designed to elevate every journey. Experience the excitement and versatility of the Jeep Wrangler Willys today!
Get the largest and best selection renewed just for you! Nearly all makes, all models, all Colorado ready! Since we're local, so are our vehicles! Our roots are here in Colorado and we'll stay here! Phil Long is a privately-held, family-owned Colorado compan
View More1565 Auto Mall Loop
Colorado Springs, Colorado 80920
(719) 694-2771
Looking for someone to work with?
View salespeople at this dealershipSimilar Vehicles
DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.

