Powered by Cars.com

2017 Cadillac XT5

$16,999used

Contact Dealership

Basics

Condition

used

Interior Color

jet black

Exterior Color

dark granite metallic

Drivetrain

All-wheel Drive

Transmission

Automatic

Fuel

Gas

Engine

3.6L V-6 gasoline direct injection, DOHC, VVT variable valve con

VIN

1GYKNDRS3HZ136940

Stock Number

X7409A

Mileage

85,477

Features

Entertainment

Premium Sound System

Exterior

Alloy Wheels

Sunroof/Moonroof

LED Headlights

Seating

Heated Seats

Leather Seats

Memory Seat

Safety

Automatic Emergency Braking

Backup Camera

Blind Spot Monitor

Brake Assist

Lane Departure Warning

Stability Control

Rear Cross Traffic Alert

Convenience

Keyless Start

Heated Steering Wheel

Remote Start

Navigation System

Power Liftgate

USB Port

HomeLink

View Full List of Features

Seller's Comments

Dark Granite Metallic 2017 Cadillac XT5 Luxury Leather Seats, Local Trade, 4x4 / 4WD / 4 Wheel Drive / AWD, Backup Camera, Sunroof/Moonroof, Bluetooth, Navigation System, Side Blind Zone, Rear Parking Assist, Moonroof, Power Drivers Seat, Heated Seats, Remote Start, XT5 Luxury, 4D Sport Utility, 3.6L V6 DI VVT, 8-Speed Automatic, AWD, Dark Granite Metallic, Black Leather, Automatic Dual-Zone Climate Control, Body-Color Heated Power-Adjustable Outside Mirrors, Driver Awareness Package, Following Distance Indicator, Forward Collision Alert, Front Pedestrian Detection, IntelliBeam Headlamps, Lane Keep Assist w/ Lane Departure Warning, Low Speed Front Automatic Braking, Preferred Equipment Group 1SD, Safety Alert Seat. 18/26 City/Highway MPGAt Sheboygan Auto, we walk it, with pride! Our Sales personnel are non-commissioned, which means we pay their wages, not you! If you are looking for a GMC, Chevrolet, or Cadillac we're a short drive away in Sheboygan. We are located on S. Business Drive, in the South part of town in Sheboygan, Wisconsin. We have a huge selection of GM vehicles for you to choose from. Our dealership is open 6 days a week, as well as our parts and service departments. Check out our hours and directions page, then make the drive to Sheboygan Chevrolet GMC Cadillac. You'll see why our Cadillac, Chevrolet, and GMC customers keep coming back to our dealership.Awards:* 2017 IIHS Top Safety Pick with optional front crash prevention Reviews:* Pleasing ride and handling; generous interior space; excellent forward visibility. Source: Edmunds

Contact Sheboygan Chevrolet Buick GMC Cadillac

Call (920) 624-4110

Sheboygan Chevrolet Buick GMC Cadillac
0 |
1,973 Lifetime Reviews

3400 S Business Dr

Sheboygan, Wisconsin 53081

(920) 624-4110

Looking for someone to work with?

View salespeople at this dealership

Similar Vehicles

new 2026 Cadillac XT5 car, priced at $47,695
2026 Cadillac XT5
new
Radiant Red Tintcoat exterior
Automatic
Front-wheel Drive
used 2022 Cadillac XT5 car, priced at $31,749
2022 Cadillac XT5
used
Rosewood Metallic exterior
Automatic
All-wheel Drive
new 2025 Cadillac XT5 car, priced at $57,685
2025 Cadillac XT5
new
Stellar Black Metallic exterior
Automatic
All-wheel Drive

DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.

Click here for more details.